Ardmore Ltd

Objective

The main requirement was to reduce carbon emissions and harmful pollutants on-site while finding a sustainable and cost-effective solution for off-grid power.

Solution

SiteGrid X45 Battery Bank paired with a 40kVA generator to power the cabins.

Results

Reduction in CO2

8.8 Tonne Reduced

CO2 Emissions

60%

60% Reduced

Operating Cost

92%

92% Reduced

Noise Pollution

Reduction in diesel consumption

92% Reduced

Diesel Consumption